RTG Projects provided the supply, installation and load testing of the 8no. anchor systems with working / design loads of up to 70kN (7 tons), for the holding down and anchoring of this 22m spanning pedestrian footbridge.

RTG Hulk anchor systems were chosen for their durability, speed of installation, constructability and minimal environmental impact at this location of outstanding natural beauty – with no grouting or wet trade requirements for the installation!

 

Client: Cable Span

Location: Lakey Weyba, Noosa (QLD)

Type of Work: Anchoring / Holding Down - Pedestrian Suspension Bridge (Permanent)